The K&A is actually being dredged. Well, not completely dredged, but spot dredged in some of the worst places. This long awaited work started on 17th October on the stretch between Bridge 97 at Mill Lane, Great Bedwyn and the Bruce Tunnel. This section is due to be finished by 16th December. After Christmas, dredging […]
↧